Today was the last day at the lab. I spent the morning updated the LIMS spreadsheet with the new callibration table and fixing a few misdirected links.
The spreadsheet is now back up to 100% and Anna went through several samples entering data and saving the sheets for subsequent upload to the VM machine.
I went through the other materials (computer files) I brought for the lab to use showing her what some of the folders contained. The rest of the time was spent working briefly with the Agilent 5973 helping Anna set up a simple method for a couple of pyrethroids.
Since tomorrow (Wednesday 31Aug11) is a holiday here there is no option for any additional work. All details of the data processing and machine QC have been covered and all is progressing well. By early next week all the samples should be run and then it will just be a matter of data processing.