An electrician evaluated the power issue and surmised that there are two big problems: The batteries in the UPS are dead (probably because the incoming power signal is insufficient to charge them) and the incoming service cables are inadequate and should be replaced. A permanent solution and invoice are pending.
Retrieval 3 samples are in vials and running on the GC overnight. There is not enough fuel for the generator to run all night (which is what we did previously to guarantee operation) so hopefully the incoming power is sufficient.
THIS BLOG IS A CONTINUING DRAFT REPORT ON THE TRAINING VISITS OF OSU SCIENTISTS TO THE CERES LABORATORY IN DAKAR, SENEGAL. The third visit by Ted Haigh, August 15, 2011 to September 3, 2011 to complete LOA# Goal#. The second visit by Lucas Quarles January to March, 2009. The first training visit by Greg Sower September 15th to October 27th, 2007. The visit is part of the UN-GEF project with Oregon State University to complete Specific Goal 3 of the LOA.